Tower Crane Safety: Operating In High Winds

Tower Crane Safety: Operating In High Winds

Strong winds will impose additional loads on a crane and may affect the crane’s stability. According to the Tower Crane Code of Practice 2017, a maximum permissible operational wind speed of 54km/hour (15 metres/second) has been traditionally specified for tower crane...